Techology and Infrastructure
Ensuring your website and Internet services are up and running 24 hours a day, 7 days a week is our top priority.
Our servers are located in a state-of-the-art raised floored datacentre in Stratford, London. The facility offers complete redundancy in protected power, HVAC, fire suppression, network connectivity and on-site manned security. The facility takes power feeds from multiple power grids, distributed via MGE UPS battery backup power and three 2.5 MVA Caterpillar diesel generators to backup primary power source with 48-hour on-site fuel storage supported by continuous refuelling contracts. Our Libert HVAC systems are configured to provide cooling redundancy in a temperature controlled environment. Fire suppression includes a dry pipe pre-action system with VESDA (Very Early Smoke Detection Apparatus).
sta.lon - Stratford, London
- 7,000 sq.ft facility
- 6,000 sq.ft of raised floor
- (5) 26-ton Libert AC units
- Dry pipe pre-action sprinkler system
- Very Early Smoke Detection Apparatus (VESDA)
- 4500+ amps of input power
- (2) 550KVA MGE UPS units
- (3) 2.5 MVA Caterpillar diesel generators
- Three point fibre duct enternace
- BMS monitoring software for all data center infrastructure
Network Infrastructure
The network utilises Juniper M Series routers at the border, Cisco Catalyst 6500 series and Foundry BigIron 10G switches in our core switching layer and Cisco 3550/3750 series switches in our distribution layer. At the customer layer we utilize Cisco 3500 and 2950 series switches.
- Juniper M Series border routers
- Cisco Catalyst 6500 Series and
- Foundry BigIron 10G core routing switches